ITAC Assessment: AM0285
ITAC logo
ITAC Assessment: AM0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Plastic film
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 108,750
ft2
Annual Production 1,093,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $596,639 19,784,291
kWh
Electricity Demand $224,023 36,989
kW-mo/yr
Electricity Fees $10,045 -
Natural Gas $37,148 6,896
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,935 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,830

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.3212: Optimize plant power factor $49,000 $70,000 - $49,000
-
kW-mo/yr
- - - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $30,300 $47,880 $46,250
2,102,286
kWh
$35,450
-
kW-mo/yr
- $(-51,400.0)
-
MMBtu
- -
03 2.8121: Apply for tax-free status for energy purchases $2,830 $5,660 - - $2,830 - - -
04 3.6194: Ship hydraulic oil to secondary fuel program $465 - - - - - $465
-
gal
-
05 3.5311: Recover and reuse waste material $340 - - - - - - $340
-
lb
TOTAL RECOMMENDED $82,935 $123,540 $46,250
2,102,286
kWh
$84,450
-
kW-mo/yr
$2,830 $(-51,400.0)
-
MMBtu
$465
-
gal
$340
-
lb
TOTAL IMPLEMENTED $51,830 $75,660 - $49,000
-
kW-mo/yr
$2,830 - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs