| Assessment Year | 1996 |
|---|---|
| Principal Product | Plastic film |
| NAICS |
n/a
|
| SIC | 3081: Unsupported Plastics Film and Sheet |
| Sales Range | $10 M to 50M |
| # of Employees | 180 |
| Plant Area |
108,750
ft2
|
| Annual Production | 1,093,000
thousand feet
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $596,639 | 19,784,291 |
kWh
|
$0.030 |
| Electricity Demand | $224,023 | 36,989 |
kW-mo/yr
|
$6.06 |
| Electricity Fees | $10,045 | - |
|
- |
| Natural Gas | $37,148 | 6,896 |
MMBtu
|
$5.39 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $82,935 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $51,830 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $49,000 | $70,000 | - |
$49,000
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $30,300 | $47,880 |
$46,250
2,102,286
kWh
|
$35,450
-
kW-mo/yr
|
- |
$(-51,400.0)
-
MMBtu
|
- | - | |
| 03 | 2.8121: Apply for tax-free status for energy purchases | $2,830 | $5,660 | - | - | $2,830 | - | - | - | |
| 04 | 3.6194: Ship hydraulic oil to secondary fuel program | $465 | - | - | - | - | - |
$465
-
gal
|
- | |
| 05 | 3.5311: Recover and reuse waste material | $340 | - | - | - | - | - | - |
$340
-
lb
|
|
| TOTAL RECOMMENDED | $82,935 | $123,540 |
$46,250
2,102,286
kWh
|
$84,450
-
kW-mo/yr
|
$2,830 |
$(-51,400.0)
-
MMBtu
|
$465
-
gal
|
$340
-
lb
|
||
| TOTAL IMPLEMENTED | $51,830 | $75,660 | - |
$49,000
-
kW-mo/yr
|
$2,830 | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs