ITAC Assessment: AM0276
ITAC logo
ITAC Assessment: AM0276
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Soft drinks
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 280
Plant Area 315,000
ft2
Annual Production 135,000,000
Tgal
Production Hrs. Annual 5,620
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $379,203 10,779,602
kWh
Electricity Demand $196,618 23,245
kW-mo/yr
Electricity Fees $288 -
Natural Gas $197,600 46,900
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.7145: Install skylights $4,180 $10,200 $4,180
160,903
kWh
- - - - -
02 2.2135: Repair and eliminate steam leaks $2,740 $80 - - $2,740
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,700 $1,620 $390
14,947
kWh
$250
-
kW-mo/yr
- - - $2,060
04 2.7124: Make a practice of turning off lights when not needed $2,420 $120 $760
29,308
kWh
$1,660
-
kW-mo/yr
- - - -
05 2.4314: Use synthetic lubricant $1,900 - $930
35,756
kWh
$970
-
kW-mo/yr
- - - -
06 2.7145: Install skylights $1,230 $6,590 $1,230
47,186
kWh
- - - - -
07 2.4133: Use most efficient type of electric motors $740 $1,310 $350
13,482
kWh
$390
-
kW-mo/yr
- - - -
08 3.8211: Convert to aqueous cleaning system $570 $1,050 - - - $(-460.0)
-
gal
$1,030
-
gal
-
TOTAL RECOMMENDED $16,480 $20,970 $7,840
301,582
kWh
$3,270
-
kW-mo/yr
$2,740
-
MMBtu
$(-460.0)
-
gal
$1,030
-
gal
$2,060
TOTAL IMPLEMENTED $7,800 $1,510 $2,040
78,546
kWh
$3,020
-
kW-mo/yr
$2,740
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs