ITAC Assessment: AM0271
ITAC logo
ITAC Assessment: AM0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Commercial & Industrial Indoor and outdoor lighting fixtures
NAICS
n/a
SIC 3648: Lighting Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 250,000
ft2
Annual Production 1,519,200
pieces
Production Hrs. Annual 4,545
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,449 1,879,836
kWh
Electricity Demand $18,132 5,453
kW-mo/yr
Electricity Fees $1,443 -
Natural Gas $72,863 14,168
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $99,532 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,865

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.3212: Optimize plant power factor $6,248 $11,200 - $6,248
-
kW-mo/yr
- - -
02 2.8114: Change rate schedules or other changes in utility service $2,147 - - - $2,147 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,170 $210 $2,170
94,373
kWh
- - - -
04 2.7124: Make a practice of turning off lights when not needed $1,860 - $1,860
81,184
kWh
- - - -
05 2.8123: Pay utility bills on time $267 - - - $267 - -
06 3.5316: Contract a wood pallet recycling company $34,400 - - - - - $34,400
-
lb
07 3.2121: Convert to electrostatic powder coating $52,440 $160,000 - - - $52,440
-
gal
-
TOTAL RECOMMENDED $99,532 $171,410 $4,030
175,557
kWh
$6,248
-
kW-mo/yr
$2,414 $52,440
-
gal
$34,400
-
lb
TOTAL IMPLEMENTED $64,865 $171,410 $4,030
175,557
kWh
$6,248
-
kW-mo/yr
$2,147 $52,440
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs