ITAC Assessment: AM0268
ITAC logo
ITAC Assessment: AM0268
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Titanium & inconel aircraft engine components
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 128
Plant Area 120,000
ft2
Annual Production 600
pieces
Production Hrs. Annual 5,134
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $420,896 10,061,548
kWh
Electricity Demand $47,449 28,584
kW-mo/yr
Natural Gas $30,856 10,405
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,594 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,854

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $28,900 - $28,900
688,746
kWh
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,295 $1,070 $280
6,741
kWh
$15
-
kW-mo/yr
- - $3,000
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,290 $700 $1,290
30,774
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $860 $1,160 $710
16,706
kWh
$150
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $694 $520 $650
15,533
kWh
$44
-
kW-mo/yr
- - -
06 2.4314: Use synthetic lubricant $740 - $700
14,947
kWh
$40
-
kW-mo/yr
- - -
07 3.4116: Meter recycled water (to reduce sewer charges) $2,230 $500 - - $2,230
-
Tgal
- -
08 3.7198: Reduce / eliminate use of disposable product $905 $110 - - - $905
-
lb
-
09 3.5315: Lease / purchase baler; sell cardboard to recycler $680 - - - - $680
-
lb
-
TOTAL RECOMMENDED $39,594 $4,060 $32,530
773,447
kWh
$249
-
kW-mo/yr
$2,230
-
Tgal
$1,585
-
lb
$3,000
TOTAL IMPLEMENTED $38,854 $4,060 $31,830
758,500
kWh
$209
-
kW-mo/yr
$2,230
-
Tgal
$1,585
-
lb
$3,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings