Assessment Year | 1996 |
---|---|
Principal Product | Titanium & inconel aircraft engine components |
NAICS |
n/a
|
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $10 M to 50M |
# of Employees | 128 |
Plant Area |
120,000
ft2
|
Annual Production | 600
pieces
|
Production Hrs. Annual | 5,134
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $420,896 | 10,061,548 |
kWh
|
$0.042 |
Electricity Demand | $47,449 | 28,584 |
kW-mo/yr
|
$1.66 |
Natural Gas | $30,856 | 10,405 |
MMBtu
|
$2.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,594 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,854 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $28,900 | - |
$28,900
688,746
kWh
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,295 | $1,070 |
$280
6,741
kWh
|
$15
-
kW-mo/yr
|
- | - | $3,000 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,290 | $700 |
$1,290
30,774
kWh
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $860 | $1,160 |
$710
16,706
kWh
|
$150
-
kW-mo/yr
|
- | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $694 | $520 |
$650
15,533
kWh
|
$44
-
kW-mo/yr
|
- | - | - | |
06 | 2.4314: Use synthetic lubricant | $740 | - |
$700
14,947
kWh
|
$40
-
kW-mo/yr
|
- | - | - | |
07 | 3.4116: Meter recycled water (to reduce sewer charges) | $2,230 | $500 | - | - |
$2,230
-
Tgal
|
- | - | |
08 | 3.7198: Reduce / eliminate use of disposable product | $905 | $110 | - | - | - |
$905
-
lb
|
- | |
09 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $680 | - | - | - | - |
$680
-
lb
|
- | |
TOTAL RECOMMENDED | $39,594 | $4,060 |
$32,530
773,447
kWh
|
$249
-
kW-mo/yr
|
$2,230
-
Tgal
|
$1,585
-
lb
|
$3,000 | ||
TOTAL IMPLEMENTED | $38,854 | $4,060 |
$31,830
758,500
kWh
|
$209
-
kW-mo/yr
|
$2,230
-
Tgal
|
$1,585
-
lb
|
$3,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs