ITAC Assessment: AM0262
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Agricultural gasoline-powered sprayers
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 38
Plant Area 65,000
ft2
Annual Production 6,000
pieces
Production Hrs. Annual 2,202
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,383 587,046
kWh
Electricity Demand $25,605 3,151
kW-mo/yr
Electricity Fees $170 -
Natural Gas $15,608 2,883
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,670 $140 $820
18,171
kWh
$850
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $1,320 $510 $1,320
29,308
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $640 $250 $70
1,758
kWh
$20
-
kW-mo/yr
- $550
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $440 $300 $440
9,672
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $420 $270 $210
4,689
kWh
$210
-
kW-mo/yr
- -
06 3.1191: Change procedures / equipment / operating conditions $3,330 $500 - - $3,330
-
lb
-
TOTAL RECOMMENDED $7,820 $1,970 $2,860
63,598
kWh
$1,080
-
kW-mo/yr
$3,330
-
lb
$550
TOTAL IMPLEMENTED $7,820 $1,970 $2,860
63,598
kWh
$1,080
-
kW-mo/yr
$3,330
-
lb
$550
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs