Assessment Year | 1996 |
---|---|
Principal Product | Agricultural gasoline-powered sprayers |
NAICS |
n/a
|
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $5 M to 10M |
# of Employees | 38 |
Plant Area |
65,000
ft2
|
Annual Production | 6,000
pieces
|
Production Hrs. Annual | 2,202
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $30,383 | 587,046 |
kWh
|
$0.052 |
Electricity Demand | $25,605 | 3,151 |
kW-mo/yr
|
$8.13 |
Electricity Fees | $170 | - |
|
- |
Natural Gas | $15,608 | 2,883 |
MMBtu
|
$5.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,820 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,820 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,670 | $140 |
$820
18,171
kWh
|
$850
-
kW-mo/yr
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $1,320 | $510 |
$1,320
29,308
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $640 | $250 |
$70
1,758
kWh
|
$20
-
kW-mo/yr
|
- | $550 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $440 | $300 |
$440
9,672
kWh
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $420 | $270 |
$210
4,689
kWh
|
$210
-
kW-mo/yr
|
- | - | |
06 | 3.1191: Change procedures / equipment / operating conditions | $3,330 | $500 | - | - |
$3,330
-
lb
|
- | |
TOTAL RECOMMENDED | $7,820 | $1,970 |
$2,860
63,598
kWh
|
$1,080
-
kW-mo/yr
|
$3,330
-
lb
|
$550 | ||
TOTAL IMPLEMENTED | $7,820 | $1,970 |
$2,860
63,598
kWh
|
$1,080
-
kW-mo/yr
|
$3,330
-
lb
|
$550 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs