Assessment Year | 1996 |
---|---|
Principal Product | Grinding & electroplating of metals, hard chrome and electro |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 101,744
thousand feet
|
Production Hrs. Annual | 4,016
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $135,351 | 3,234,467 |
kWh
|
$0.042 |
Electricity Demand | $56,804 | 8,539 |
kW-mo/yr
|
$6.65 |
Electricity Fees | $6,360 | - |
|
- |
Natural Gas | $88,959 | 17,289 |
MMBtu
|
$5.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,440 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,310 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,920 | $9,040 |
$1,400
63,599
kWh
|
$2,520
-
kW-mo/yr
|
- | - | |
02 | 2.2511: Insulate bare equipment | $2,800 | $110 | - | - |
$2,800
-
MMBtu
|
- | |
03 | 2.7141: Lower light fixtures in high ceiling areas | $1,480 | $770 |
$530
24,326
kWh
|
$950
-
kW-mo/yr
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,350 | $500 | - | - |
$1,350
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,150 | $200 |
$1,150
52,169
kWh
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $1,030 | $850 | - | - |
$1,030
-
MMBtu
|
- | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $510 | $175 |
$190
8,792
kWh
|
$320
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $260 | $110 |
$60
2,931
kWh
|
$200
-
kW-mo/yr
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $90 | $180 |
$30
1,465
kWh
|
$60
-
kW-mo/yr
|
- | - | |
10 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $5,850 | $40,000 | - | - | - |
$5,850
-
gal
|
|
TOTAL RECOMMENDED | $18,440 | $51,935 |
$3,360
153,282
kWh
|
$4,050
-
kW-mo/yr
|
$5,180
-
MMBtu
|
$5,850
-
gal
|
||
TOTAL IMPLEMENTED | $8,310 | $11,055 |
$2,830
128,956
kWh
|
$3,100
-
kW-mo/yr
|
$2,380
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs