ITAC Assessment: AM0257
ITAC logo
ITAC Assessment: AM0257
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Mirrors
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $5
M
to 10
M
# of Employees 41
Plant Area 53,000
ft2
Annual Production 5,600
thousand feet
Production Hrs. Annual 2,034
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,650 1,977,726
kWh
Electricity Demand $54,106 10,788
kW-mo/yr
Electricity Fees $101 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,860 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,740

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings
01 2.2511: Insulate bare equipment $1,760 $940 $1,760
38,101
kWh
-
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,160 - $1,160
25,205
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $460 $500 $460
10,258
kWh
-
04 3.1191: Change procedures / equipment / operating conditions $29,120 $3,000 - $29,120
-
gal
05 3.1191: Change procedures / equipment / operating conditions $18,700 $320 - $18,700
-
gal
06 3.8142: Distill contaminated solvents for reuse $4,660 $13,100 - $4,660
-
gal
TOTAL RECOMMENDED $55,860 $17,860 $3,380
73,564
kWh
$52,480
-
gal
TOTAL IMPLEMENTED $26,740 $14,860 $3,380
73,564
kWh
$23,360
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs