ITAC Assessment: AM0252
ITAC logo
ITAC Assessment: AM0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Steel weldments
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $1
M
to 5
M
# of Employees 48
Plant Area 46,000
ft2
Annual Production 1,620
ton
Production Hrs. Annual 4,328
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,113 1,125,733
kWh
Natural Gas $20,400 5,160
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,985

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $5,600 $2,105 - $5,600
02 2.7145: Install skylights $1,500 $3,200 $1,500
57,444
kWh
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,060 - $1,060
33,118
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $780 $124 $780
10,844
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $560 $690 $560
20,516
kWh
-
06 2.6212: Turn off equipment during breaks, reduce operating time $250 - $250
9,379
kWh
-
07 2.4133: Use most efficient type of electric motors $75 $370 $75
1,172
kWh
-
TOTAL RECOMMENDED $9,825 $6,489 $4,225
132,473
kWh
$5,600
TOTAL IMPLEMENTED $7,985 $6,365 $2,385
88,511
kWh
$5,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs