ITAC Assessment: AM0245
ITAC logo
ITAC Assessment: AM0245
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Welded steel tube, fabricated steel line pipe and mechanical
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 116
Plant Area 160,000
ft2
Annual Production 63,000
ton
Production Hrs. Annual 6,048
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $692,210 17,924,971
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $20,880 $69,400 $27,100
-
kWh
$(-6,220.0)
-
MMBtu
- - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $21,630 - $21,630
-
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,100 $800 $2,100
90,270
kWh
- - - -
04 2.4314: Use synthetic lubricant $1,680 - $1,680
56,272
kWh
- - - -
05 2.7124: Make a practice of turning off lights when not needed $390 $690 $390
11,137
kWh
- - - -
06 3.7198: Reduce / eliminate use of disposable product $7,450 $7,900 - - - - $7,450
-
lb
07 3.7131: Use a rag recycle service $2,000 - - - - - $2,000
-
lb
08 3.8211: Convert to aqueous cleaning system $1,060 $3,600 - - - $1,060
-
gal
-
09 3.6192: Use a less expensive method of waste removal $560 - - - $560
-
gal
- -
10 3.6192: Use a less expensive method of waste removal $130 - - - - - $130
-
lb
TOTAL RECOMMENDED $57,880 $82,390 $52,900
157,679
kWh
$(-6,220.0)
-
MMBtu
$560
-
gal
$1,060
-
gal
$9,580
-
lb
TOTAL IMPLEMENTED $13,300 $12,300 $2,100
90,270
kWh
- $560
-
gal
$1,060
-
gal
$9,580
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs