| Assessment Year | 1995 |
|---|---|
| Principal Product | Plastic produce bags |
| NAICS |
n/a
|
| SIC | 2673: Plastics, Foil, and Coated Paper Bags |
| Sales Range | $5 M to 10M |
| # of Employees | 60 |
| Plant Area |
37,000
ft2
|
| Annual Production | 5,500,000
lb
|
| Production Hrs. Annual | 7,344
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $255,132 | 4,449,883 |
kWh
|
$0.057 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,330 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,330 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $6,230 | - | - | $6,230 | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,860 | $40 |
$3,860
83,822
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,340 | $1,570 |
$1,340
27,843
kWh
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $870 | $170 |
$870
18,464
kWh
|
- | |
| 05 | 2.3134: Shift from daytime to nighttime operation | $780 | - |
$780
-
kWh
|
- | |
| 06 | 2.2511: Insulate bare equipment | $670 | $835 |
$670
24,912
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $640 | $1,960 |
$640
7,034
kWh
|
- | |
| 08 | 2.4314: Use synthetic lubricant | $610 | - |
$610
13,189
kWh
|
- | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $330 | $500 |
$330
12,016
kWh
|
- | |
| TOTAL RECOMMENDED | $15,330 | $5,075 |
$9,100
187,280
kWh
|
$6,230 | ||
| TOTAL IMPLEMENTED | $15,330 | $5,075 |
$9,100
187,280
kWh
|
$6,230 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs