ITAC Assessment: AM0232
ITAC logo
ITAC Assessment: AM0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Packaged snack foods and tortilla chips
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $5
M
to 10
M
# of Employees 87
Plant Area 32,278
ft2
Annual Production 5,200,000
lb
Production Hrs. Annual 4,605
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,765 660,903
kWh
Natural Gas $43,424 14,171
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,919

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $397 $422 $397
3,810
kWh
-
02 2.2511: Insulate bare equipment $2,220 $1,360 - $2,220
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,261 $2,750 $1,261
18,464
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $512 $260 $512
7,327
kWh
-
05 2.4314: Use synthetic lubricant $419 - $419
3,224
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $110 $248 $110
1,172
kWh
-
TOTAL RECOMMENDED $4,919 $5,040 $2,699
33,997
kWh
$2,220
-
MMBtu
TOTAL IMPLEMENTED $4,919 $5,040 $2,699
33,997
kWh
$2,220
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs