ITAC Assessment: AM0226
ITAC logo
ITAC Assessment: AM0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Bricks
NAICS
n/a
SIC 3251: Brick and Structural Clay Tile
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 233,600
ft2
Annual Production 203,000
ton
Production Hrs. Annual 4,732
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $526,256 9,207,503
kWh
Natural Gas $692,471 299,560
MMBtu
Fuel Oil #2 $49,000 9,100
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,658 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,636

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings
01 2.3212: Optimize plant power factor $5,136 $5,690 $5,136
-
kWh
-
02 2.4314: Use synthetic lubricant $2,520 - $2,520
50,996
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $820 $730 $820
16,413
kWh
-
04 2.7134: Use photocell controls $500 $125 $500
16,706
kWh
-
05 2.7124: Make a practice of turning off lights when not needed $180 - $180
6,155
kWh
-
06 3.8132: Use less toxic and volatile solvent substitutes $502 $1,200 - $502
-
gal
TOTAL RECOMMENDED $9,658 $7,745 $9,156
90,270
kWh
$502
-
gal
TOTAL IMPLEMENTED $6,636 $6,545 $6,636
39,274
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs