ITAC Assessment: AM0214
ITAC logo
ITAC Assessment: AM0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product High and low carbon steel wiredrawing
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 71,000
ft2
Annual Production 30,000
ton
Production Hrs. Annual 7,340
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $238,150 3,138,628
kWh
Natural Gas $167,823 49,220
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $450

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $10,770 $200,000 $44,640
733,880
kWh
$(-33,870.0)
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $6,160 $540 - $6,160
-
MMBtu
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $5,350 $300 $5,350
102,872
kWh
-
04 2.2211: Use optimum temperature $790 $1,000 - $790
-
MMBtu
05 2.1133: Adjust burners for efficient operation $450 $680 - $450
-
MMBtu
06 2.2511: Insulate bare equipment $300 - - $300
-
MMBtu
TOTAL RECOMMENDED $23,820 $202,520 $49,990
836,752
kWh
$(-26,170.0)
-
MMBtu
TOTAL IMPLEMENTED $450 $680 - $450
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs