ITAC Assessment: AM0210
ITAC logo
ITAC Assessment: AM0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Newspapers
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 43,500
ft2
Annual Production 9,360,000
pieces
Production Hrs. Annual 5,824
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,271 1,388,335
kWh
Natural Gas $6,824 1,458
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,367 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,527

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2531: Re-size charging openings or add movable cover or door $1,430 $680 $1,050
26,377
kWh
$380
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,107 $910 $1,107
21,395
kWh
-
03 2.2437: Recover waste heat from equipment $890 $150 - $890
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $880 $500 $880
21,981
kWh
-
05 2.6218: Turn off equipment when not in use $840 - $840
21,102
kWh
-
06 2.6212: Turn off equipment during breaks, reduce operating time $220 - $220
5,569
kWh
-
TOTAL RECOMMENDED $5,367 $2,240 $4,097
96,424
kWh
$1,270
-
MMBtu
TOTAL IMPLEMENTED $4,527 $2,240 $3,257
75,322
kWh
$1,270
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs