ITAC Assessment: AM0208
ITAC logo
ITAC Assessment: AM0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Windshield solvent, hair spray, tire repair sealants, auto c
NAICS
n/a
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 95,000
ft2
Annual Production 33,410,000
pieces
Production Hrs. Annual 2,024
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,225 1,572,978
kWh
Natural Gas $11,977 2,603
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,575

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $13,375 $16,000 - - $13,375
02 2.6218: Turn off equipment when not in use $6,550 $2,135 $6,550
111,665
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,265 $5,320 $4,265
84,115
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,570 $5,850 $2,570
27,550
kWh
- -
05 2.2136: Install / repair insulation on steam lines $815 $1,535 - $815
-
MMBtu
-
TOTAL RECOMMENDED $27,575 $30,840 $13,385
223,330
kWh
$815
-
MMBtu
$13,375
TOTAL IMPLEMENTED $27,575 $30,840 $13,385
223,330
kWh
$815
-
MMBtu
$13,375
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs