ITAC Assessment: AM0206
ITAC logo
ITAC Assessment: AM0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Buckets, water screens, and custom fabrications
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 65,000
ft2
Annual Production 600
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,630 742,087
kWh
Natural Gas $3,835 775
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,075 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,440

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,300 $12,060 $10,300
107,562
kWh
- -
02 2.3212: Optimize plant power factor $5,850 $9,085 - - $5,850
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,600 $11,590 $5,600
73,271
kWh
- -
04 2.6218: Turn off equipment when not in use $2,840 $670 $2,840
38,394
kWh
- -
05 2.7145: Install skylights $1,920 $9,040 $1,920
34,291
kWh
- -
06 2.7231: Use radiant heater for spot heating $1,710 $990 - $1,710
-
MMBtu
-
07 2.8123: Pay utility bills on time $855 - - - $855
TOTAL RECOMMENDED $29,075 $43,435 $20,660
253,518
kWh
$1,710
-
MMBtu
$6,705
TOTAL IMPLEMENTED $8,440 $12,260 $8,440
111,665
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs