Assessment Year | 1994 |
---|---|
Principal Product | Heating, Air conditioning, ventilating equipment |
NAICS |
n/a
|
SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
Sales Range | $10 M to 50M |
# of Employees | 350 |
Plant Area |
151,000
ft2
|
Annual Production | 27,000
pieces
|
Production Hrs. Annual | 4,320
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $212,625 | 3,838,511 |
kWh
|
$0.055 |
Natural Gas | $37,009 | 7,357 |
MMBtu
|
$5.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,797 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,702 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|
01 | 4.652: Replace existing equipment with more suitable substitutes | $3,520 | $1,000 |
$3,520
52,755
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,520 | $1,500 |
$2,520
108,441
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $660 | $13 |
$660
12,896
kWh
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $100 | $185 |
$100
4,396
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $102 | $52 |
$102
1,172
kWh
|
- | |
06 | 3.5111: Filter and reuse hydraulic oil | $1,800 | - | - |
$1,800
-
lb
|
|
07 | 3.8142: Distill contaminated solvents for reuse | $95 | $6,000 | - |
$95
-
lb
|
|
TOTAL RECOMMENDED | $8,797 | $8,750 |
$6,902
179,660
kWh
|
$1,895
-
lb
|
||
TOTAL IMPLEMENTED | $8,702 | $2,750 |
$6,902
179,660
kWh
|
$1,800
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (haz) Savings |