ITAC Assessment: AM0204
ITAC logo
ITAC Assessment: AM0204
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Heating, Air conditioning, ventilating equipment
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 151,000
ft2
Annual Production 27,000
pieces
Production Hrs. Annual 4,320
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $212,625 3,838,511
kWh
Natural Gas $37,009 7,357
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,797 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,702

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (haz) Savings
01 4.652: Replace existing equipment with more suitable substitutes $3,520 $1,000 $3,520
52,755
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,520 $1,500 $2,520
108,441
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $660 $13 $660
12,896
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $100 $185 $100
4,396
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $102 $52 $102
1,172
kWh
-
06 3.5111: Filter and reuse hydraulic oil $1,800 - - $1,800
-
lb
07 3.8142: Distill contaminated solvents for reuse $95 $6,000 - $95
-
lb
TOTAL RECOMMENDED $8,797 $8,750 $6,902
179,660
kWh
$1,895
-
lb
TOTAL IMPLEMENTED $8,702 $2,750 $6,902
179,660
kWh
$1,800
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs