ITAC Assessment: AM0191
ITAC logo
ITAC Assessment: AM0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product ornamental and wood burning fire places
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area
n/a
Annual Production 46,253
pieces
Production Hrs. Annual 5,448
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,543 1,686,108
kWh
Natural Gas $5,664 1,321
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,570 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,920

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,900 $2,300 $11,900
339,977
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,800 $3,200 $10,800
150,938
kWh
-
03 2.8121: Apply for tax-free status for energy purchases $10,200 $4,100 $10,200
-
kWh
-
04 2.7132: Install timers on light switches in little used areas $8,650 $3,680 $8,650
246,190
kWh
-
05 2.6212: Turn off equipment during breaks, reduce operating time $750 - $750
20,516
kWh
-
06 2.8123: Pay utility bills on time $700 - - $700
07 2.4131: Size electric motors for peak operating efficiency $570 - $570
16,120
kWh
-
TOTAL RECOMMENDED $43,570 $13,280 $42,870
773,741
kWh
$700
TOTAL IMPLEMENTED $34,920 $9,600 $34,220
527,551
kWh
$700
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs