ITAC Assessment: AM0189
ITAC logo
ITAC Assessment: AM0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Machining and welding metal products for oil and natural gas
NAICS
n/a
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 100,100
ft2
Annual Production 1,500,000
lb
Production Hrs. Annual 5,221
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,160 1,152,989
kWh
Natural Gas $4,571 965
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,300 $1,500 $11,300
230,950
kWh
02 2.4131: Size electric motors for peak operating efficiency $8,740 $26,200 $8,740
3,517
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,540 $70 $4,540
65,944
kWh
04 2.7124: Make a practice of turning off lights when not needed $2,760 - $2,760
55,393
kWh
05 2.8123: Pay utility bills on time $540 - $540
-
kWh
06 2.6212: Turn off equipment during breaks, reduce operating time $150 - $150
2,931
kWh
07 2.6218: Turn off equipment when not in use $120 - $120
2,345
kWh
TOTAL RECOMMENDED $28,150 $27,770 $28,150
361,080
kWh
TOTAL IMPLEMENTED $19,140 $1,570 $19,140
352,287
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs