ITAC Assessment: AM0179
ITAC logo
ITAC Assessment: AM0179
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Pre-fabricated steel buildings, stee
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 48,000
ton
Production Hrs. Annual 5,855
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $296,499 4,128,371
kWh
Natural Gas $25,756 5,544
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,980

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $34,850 $45,000 $34,850
-
kWh
-
02 2.7231: Use radiant heater for spot heating $14,970 $10,890 - $14,970
-
MMBtu
03 2.8114: Change rate schedules or other changes in utility service $10,850 - $10,850
-
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,280 $500 $8,280
186,108
kWh
-
05 2.6212: Turn off equipment during breaks, reduce operating time $2,640 - $2,640
60,961
kWh
-
06 2.7124: Make a practice of turning off lights when not needed $1,210 $1,230 $1,210
19,637
kWh
-
07 2.4133: Use most efficient type of electric motors $760 $3,920 $760
10,551
kWh
-
TOTAL RECOMMENDED $73,560 $61,540 $58,590
277,257
kWh
$14,970
-
MMBtu
TOTAL IMPLEMENTED $53,980 $45,500 $53,980
186,108
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs