ITAC Assessment: AM0178
ITAC logo
ITAC Assessment: AM0178
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Metal utility poles
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 116,900
ft2
Annual Production 4,900
ton
Production Hrs. Annual 4,505
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $203,348 2,509,672
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3212: Optimize plant power factor $48,960 $72,000 $48,960
427,902
kWh
02 2.3212: Optimize plant power factor $34,000 $38,500 $34,000
-
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,960 $600 $4,960
95,252
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,760 $24,300 $7,760
111,665
kWh
05 2.7124: Make a practice of turning off lights when not needed $1,280 - $1,280
24,619
kWh
TOTAL RECOMMENDED $96,960 $135,400 $96,960
659,438
kWh
TOTAL IMPLEMENTED $35,280 $38,500 $35,280
24,619
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs