ITAC Assessment: AM0176
ITAC logo
ITAC Assessment: AM0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product liquid detergents , disinfectants
NAICS
n/a
SIC 2841: Soap and Other Detergents, Except Specialty Cleaners
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 30,000
ft2
Annual Production 850
Tgal
Production Hrs. Annual 2,125
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,050 2,200,176
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,010

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,710 $400 $1,710
32,825
kWh
-
02 2.7224: Reduce space conditioning during non-working hours $1,925 $135 $745
14,361
kWh
$1,180
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,375 $2,290 $1,375
21,102
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $550 - $550
6,741
kWh
-
TOTAL RECOMMENDED $5,560 $2,825 $4,380
75,029
kWh
$1,180
-
MMBtu
TOTAL IMPLEMENTED $5,010 $2,825 $3,830
68,288
kWh
$1,180
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs