ITAC Assessment: AM0174
ITAC logo
ITAC Assessment: AM0174
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product downhole drilling and fishing tools
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 157
Plant Area 30,000
ft2
Annual Production 600
pieces
Production Hrs. Annual 6,024
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,895 1,842,614
kWh
Natural Gas $33,390 6,029
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,930

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7124: Make a practice of turning off lights when not needed $6,460 - $6,460
77,374
kWh
-
02 2.4226: Use / purchase optimum sized compressor $3,950 - $3,950
36,635
kWh
-
03 2.7235: Install fossil fuel make-up air unit $890 $460 - $890
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,720 $420 $2,720
53,341
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,370 - $1,370
21,395
kWh
-
TOTAL RECOMMENDED $15,390 $880 $14,500
188,745
kWh
$890
-
MMBtu
TOTAL IMPLEMENTED $8,930 $880 $8,040
111,371
kWh
$890
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs