ITAC Assessment: AM0173
ITAC logo
ITAC Assessment: AM0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product hydrogen peroxide and butyllithium
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 98
Plant Area
n/a
Annual Production 82,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,339,944 34,665,006
kWh
Other Energy $827,587 272,410
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $172,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,260

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $146,200 - $146,200
3,927,315
kWh
-
02 2.4234: Cool compressor air intake with heat exchanger $18,000 - $18,000
363,423
kWh
-
03 2.4133: Use most efficient type of electric motors $4,140 $8,000 $4,140
110,199
kWh
-
04 2.2135: Repair and eliminate steam leaks $3,670 $600 - $3,670
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $160 - $160
2,052
kWh
-
06 2.7111: Reduce illumination to minimum necessary levels $290 $240 $290
11,430
kWh
-
TOTAL RECOMMENDED $172,460 $8,840 $168,790
4,414,419
kWh
$3,670
-
MMBtu
TOTAL IMPLEMENTED $8,260 $8,840 $4,590
123,681
kWh
$3,670
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs