ITAC Assessment: AM0171
ITAC logo
ITAC Assessment: AM0171
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product steel plate tank heads
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 881,664
ft2
Annual Production 24,000
pieces
Production Hrs. Annual 7,248
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $491,985 7,868,406
kWh
Natural Gas $261,727 113,011
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,280 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,460

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1135: Repair furnaces and oven doors so that they seal efficiently $11,850 $820 - $11,850
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $10,780 $10,160 - $10,780
-
MMBtu
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $22,300 $54,800 $22,300
827,081
kWh
-
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $18,500 $72,675 $18,500
684,642
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $2,710 $10,160 - $2,710
-
MMBtu
06 2.6218: Turn off equipment when not in use $3,100 - $3,100
114,302
kWh
-
07 2.5194: Redesign process $830 $712 - $830
-
MMBtu
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,690 $4,630 $1,690
62,720
kWh
-
09 2.6212: Turn off equipment during breaks, reduce operating time $520 - $520
19,343
kWh
-
TOTAL RECOMMENDED $72,280 $153,957 $46,110
1,708,088
kWh
$26,170
-
MMBtu
TOTAL IMPLEMENTED $39,460 $60,250 $27,610
1,023,446
kWh
$11,850
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs