ITAC Assessment: AM0167
ITAC logo
ITAC Assessment: AM0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product fuel additives & lubricants
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 139
Plant Area 1,742,400
ft2
Annual Production 75,000
ton
Production Hrs. Annual 8,712
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,193,706 29,940,211
kWh
Natural Gas $727,160 415,299
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6214: Shut off pilots in standby equipment $28,100 - - $28,100
-
MMBtu
02 2.3212: Optimize plant power factor $10,100 $16,000 $10,100
-
kWh
-
03 2.4133: Use most efficient type of electric motors $5,720 $4,400 $5,720
153,869
kWh
-
04 2.4133: Use most efficient type of electric motors $4,610 $4,900 $4,610
99,355
kWh
-
05 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $2,970 $2,450 - $2,970
-
MMBtu
06 2.7111: Reduce illumination to minimum necessary levels $1,290 - $1,290
52,755
kWh
-
TOTAL RECOMMENDED $52,790 $27,750 $21,720
305,979
kWh
$31,070
-
MMBtu
TOTAL IMPLEMENTED $48,530 $25,300 $20,430
253,224
kWh
$28,100
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs