Assessment Year | 1992 |
---|---|
Principal Product | STEEL TUBING & CASINGS |
NAICS |
n/a
|
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 37,000
ton
|
Production Hrs. Annual | 2,535
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $382,220 | 4,113,716 |
kWh
|
$0.093 |
Natural Gas | $1,629 | 369 |
MMBtu
|
$4.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $161,842 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $140,202 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $93,089 | - |
$98,159
-
kWh
|
$(-5,070.0) | |
02 | 2.3212: Optimize plant power factor | $44,815 | $64,750 |
$44,815
-
kWh
|
- | |
03 | 2.2531: Re-size charging openings or add movable cover or door | $19,440 | $850 |
$19,440
243,259
kWh
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $1,158 | $1,030 |
$1,158
9,379
kWh
|
- | |
05 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $2,200 | $419 |
$2,200
49,824
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,140 | $910 |
$1,140
26,084
kWh
|
- | |
TOTAL RECOMMENDED | $161,842 | $67,959 |
$166,912
328,546
kWh
|
$(-5,070.0) | ||
TOTAL IMPLEMENTED | $140,202 | $66,690 |
$145,272
35,463
kWh
|
$(-5,070.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs