| Assessment Year | 1992 |
|---|---|
| Principal Product | STEEL FORGINGS |
| NAICS |
n/a
|
| SIC | 3462: Iron and Steel Forgings |
| Sales Range | $1 M to 5M |
| # of Employees | 260 |
| Plant Area |
n/a
|
| Annual Production | 24,600,000
lb
|
| Production Hrs. Annual | 6,024
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $283,804 | 4,036,929 |
kWh
|
$0.070 |
| Natural Gas | $719,204 | 276,098 |
MMBtu
|
$2.60 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $161,985 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $161,985 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6124: Establish equipment maintenance schedule | $67,280 | $2,250 | - |
$67,280
-
MMBtu
|
|
| 02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $37,400 | $53,200 | - |
$37,400
-
MMBtu
|
|
| 03 | 2.2511: Insulate bare equipment | $32,285 | $96,000 | - |
$32,285
-
MMBtu
|
|
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $13,410 | - |
$13,410
-
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,180 | $630 |
$9,180
213,658
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,470 | $4,080 |
$1,470
19,930
kWh
|
- | |
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $960 | - |
$960
22,274
kWh
|
- | |
| TOTAL RECOMMENDED | $161,985 | $156,160 |
$25,020
255,862
kWh
|
$136,965
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $161,985 | $156,160 |
$25,020
255,862
kWh
|
$136,965
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs