ITAC Assessment: AM0154
ITAC logo
ITAC Assessment: AM0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product TEFLON INJECTION MOLDING
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 575,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,175 2,459,848
kWh
Natural Gas $1,316 274
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,245 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,523

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $2,580 $4,050 $2,580
101,114
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $1,142 $80 $1,142
46,893
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $544 - $688
26,964
kWh
$(-144.0)
04 2.4133: Use most efficient type of electric motors $979 $440 $979
19,637
kWh
-
TOTAL RECOMMENDED $5,245 $4,570 $5,389
194,608
kWh
$(-144.0)
TOTAL IMPLEMENTED $1,523 $440 $1,667
46,601
kWh
$(-144.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs