ITAC Assessment: AM0117
ITAC logo
ITAC Assessment: AM0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product STEEL REINFORCING BARS
NAICS
n/a
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 40,000
ton
Production Hrs. Annual 3,500
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,725 803,341
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,459 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3134: Shift from daytime to nighttime operation $4,016 - $4,016
-
kWh
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $945 $5,640 $945
16,413
kWh
03 2.6212: Turn off equipment during breaks, reduce operating time $330 $340 $330
5,862
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $93 $100 $93
1,172
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $75 $5,858 $75
1,172
kWh
TOTAL RECOMMENDED $5,459 $11,938 $5,459
24,619
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs