ITAC Assessment: AM0115
ITAC logo
ITAC Assessment: AM0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product MAGAZINES, BROCHURES
NAICS
n/a
SIC 2741: Miscellaneous Publishing
Sales Range $10
M
to 50
M
# of Employees 162
Plant Area
n/a
Annual Production 5,200,000
lb
Production Hrs. Annual 7,272
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,063 3,000,586
kWh
Natural Gas $19,168 3,809
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,271 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,348 - $2,028
42,790
kWh
- $(-680.0)
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,600 $7,000 $3,600
-
kWh
- -
03 2.7492: Use proper thickness of insulation on building envelope $2,020 $3,220 $1,310
41,325
kWh
$710
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $923 $40 $923
29,308
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $240 - $240
7,620
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $140 $213 $140
4,689
kWh
- -
TOTAL RECOMMENDED $8,271 $10,473 $8,241
125,732
kWh
$710
-
MMBtu
$(-680.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs