ITAC Assessment: AM0110
ITAC logo
ITAC Assessment: AM0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DRILL FLUID CONDITIONING EQUIPMENT
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 3,250
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,461 1,060,961
kWh
Natural Gas $4,812 1,216
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,741 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3212: Optimize plant power factor $1,260 $5,180 $1,260
-
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $510 $750 $510
6,155
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $131 $105 $131
2,052
kWh
04 2.7111: Reduce illumination to minimum necessary levels $315 $52 $315
4,689
kWh
05 2.7111: Reduce illumination to minimum necessary levels $240 $100 $240
3,517
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $200 $160 $200
3,810
kWh
07 2.6212: Turn off equipment during breaks, reduce operating time $85 - $85
1,758
kWh
TOTAL RECOMMENDED $2,741 $6,347 $2,741
21,981
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs