ITAC Assessment: AM0109
ITAC logo
ITAC Assessment: AM0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product VINYL COATING
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 118
Plant Area
n/a
Annual Production 1,300,000
lb
Production Hrs. Annual 4,080
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,352 1,650,059
kWh
Natural Gas $78,588 15,290
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,806 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,806

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,730 $400 $1,730
63,013
kWh
-
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $700 $156 $700
19,930
kWh
-
03 2.2611: Moderate cooling tower outlet temperature $550 - $550
19,930
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $490 $294 $490
7,913
kWh
-
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $304 - $280
2,931
kWh
$24
06 2.7142: Utilize higher efficiency lamps and/or ballasts $32 $17 $32
586
kWh
-
TOTAL RECOMMENDED $3,806 $867 $3,782
114,303
kWh
$24
TOTAL IMPLEMENTED $3,806 $867 $3,782
114,303
kWh
$24
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs