ITAC Assessment: AM0097
ITAC logo
ITAC Assessment: AM0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product FRESH MEAT AND SAUSAGES
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 25,000
pieces
Production Hrs. Annual 5,300
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,372 1,470,106
kWh
Natural Gas $60,128 13,020
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $449

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2121: Increase amount of condensate returned $1,357 - - $1,150
-
MMBtu
$207
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $700 - $700
-
kWh
- -
03 2.8112: Combine utility meters $694 $1,100 - $694
-
MMBtu
-
04 2.2511: Insulate bare equipment $250 $60 - $250
-
MMBtu
-
05 2.2136: Install / repair insulation on steam lines $200 $530 - $200
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $136 $52 $136
3,224
kWh
- -
07 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $63 - $63
2,638
kWh
- -
TOTAL RECOMMENDED $3,400 $1,742 $899
5,862
kWh
$2,294
-
MMBtu
$207
TOTAL IMPLEMENTED $449 $112 $199
5,862
kWh
$250
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs