Assessment Year | 1990 |
---|---|
Principal Product | FOAMED PLASTIC, PADDING |
NAICS |
n/a
|
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 93 |
Plant Area |
n/a
|
Annual Production | 123,750
thousand feet
|
Production Hrs. Annual | 6,264
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $127,928 | 2,441,090 |
kWh
|
$0.052 |
Natural Gas | $73,039 | 16,008 |
MMBtu
|
$4.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,421 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,291 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $10,920 | $50,000 |
$10,920
245,018
kWh
|
- | |
02 | 2.7492: Use proper thickness of insulation on building envelope | $5,910 | $3,880 | - |
$5,910
-
MMBtu
|
|
03 | 2.2135: Repair and eliminate steam leaks | $2,700 | $800 | - |
$2,700
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,570 | $1,000 |
$2,570
82,063
kWh
|
- | |
05 | 2.4312: Improve lubrication practices | $1,530 | $3,000 |
$1,530
49,531
kWh
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,130 | $270 | - |
$1,130
-
MMBtu
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $176 | $257 |
$176
4,982
kWh
|
- | |
08 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $318 | - |
$318
10,258
kWh
|
- | |
09 | 2.2136: Install / repair insulation on steam lines | $167 | $275 | - |
$167
-
MMBtu
|
|
TOTAL RECOMMENDED | $25,421 | $59,482 |
$15,514
391,852
kWh
|
$9,907
-
MMBtu
|
||
TOTAL IMPLEMENTED | $24,291 | $59,212 |
$15,514
391,852
kWh
|
$8,777
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs