ITAC Assessment: AM0072
ITAC logo
ITAC Assessment: AM0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product OIL FIELD TOOLS
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,042
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $370,650 8,521,981
kWh
Natural Gas $94,618 20,182
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,996

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $45,100 $82,000 $45,100
937,866
kWh
-
02 2.2414: Use waste heat from hot flue gases to preheat $13,470 $24,000 $(-1,800.0)
(-17,585)
kWh
$15,270
-
MMBtu
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $9,950 $56,300 $9,950
373,681
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,400 $1,000 $5,400
203,107
kWh
-
05 2.8123: Pay utility bills on time $3,941 - $3,941
-
kWh
-
06 2.6212: Turn off equipment during breaks, reduce operating time $2,900 $2,900 $2,900
109,906
kWh
-
07 2.7111: Reduce illumination to minimum necessary levels $1,670 $350 $1,670
35,170
kWh
-
08 2.8114: Change rate schedules or other changes in utility service $1,085 - $1,085
-
kWh
-
09 2.6212: Turn off equipment during breaks, reduce operating time $680 - $680
25,498
kWh
-
TOTAL RECOMMENDED $84,196 $166,550 $68,926
1,667,643
kWh
$15,270
-
MMBtu
TOTAL IMPLEMENTED $14,996 $4,250 $14,996
348,183
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs