| Assessment Year | 1989 |
|---|---|
| Principal Product | OIL FIELD TOOLS |
| NAICS |
n/a
|
| SIC | 3533: Oil and Gas Field Machinery and Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 5,042
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $370,650 | 8,521,981 |
kWh
|
$0.043 |
| Natural Gas | $94,618 | 20,182 |
MMBtu
|
$4.69 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $84,196 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,996 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $45,100 | $82,000 |
$45,100
937,866
kWh
|
- | |
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $13,470 | $24,000 |
$(-1,800.0)
(-17,585)
kWh
|
$15,270
-
MMBtu
|
|
| 03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $9,950 | $56,300 |
$9,950
373,681
kWh
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,400 | $1,000 |
$5,400
203,107
kWh
|
- | |
| 05 | 2.8123: Pay utility bills on time | $3,941 | - |
$3,941
-
kWh
|
- | |
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,900 | $2,900 |
$2,900
109,906
kWh
|
- | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $1,670 | $350 |
$1,670
35,170
kWh
|
- | |
| 08 | 2.8114: Change rate schedules or other changes in utility service | $1,085 | - |
$1,085
-
kWh
|
- | |
| 09 | 2.6212: Turn off equipment during breaks, reduce operating time | $680 | - |
$680
25,498
kWh
|
- | |
| TOTAL RECOMMENDED | $84,196 | $166,550 |
$68,926
1,667,643
kWh
|
$15,270
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $14,996 | $4,250 |
$14,996
348,183
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs