ITAC Assessment: AM0070
ITAC logo
ITAC Assessment: AM0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product INDUSTR. MICROPROCESSORS
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area
n/a
Annual Production 5,000
pieces
Production Hrs. Annual 2,288
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,607 3,395,956
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,744 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $295

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $18,800 $34,600 $18,800
-
kWh
-
02 2.3212: Optimize plant power factor $3,500 $4,000 $3,500
-
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $175 $250 $100
3,517
kWh
$75
04 2.4312: Improve lubrication practices $149 - $149
5,275
kWh
-
05 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $120 - $120
4,396
kWh
-
TOTAL RECOMMENDED $22,744 $38,850 $22,669
13,188
kWh
$75
TOTAL IMPLEMENTED $295 $250 $220
7,913
kWh
$75
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs