| Assessment Year | 1989 |
|---|---|
| Principal Product | INDUSTR. MICROPROCESSORS |
| NAICS |
n/a
|
| SIC | 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products |
| Sales Range | $10 M to 50M |
| # of Employees | 275 |
| Plant Area |
n/a
|
| Annual Production | 5,000
pieces
|
| Production Hrs. Annual | 2,288
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $167,607 | 3,395,956 |
kWh
|
$0.049 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,744 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $295 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $18,800 | $34,600 |
$18,800
-
kWh
|
- | |
| 02 | 2.3212: Optimize plant power factor | $3,500 | $4,000 |
$3,500
-
kWh
|
- | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $175 | $250 |
$100
3,517
kWh
|
$75 | |
| 04 | 2.4312: Improve lubrication practices | $149 | - |
$149
5,275
kWh
|
- | |
| 05 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $120 | - |
$120
4,396
kWh
|
- | |
| TOTAL RECOMMENDED | $22,744 | $38,850 |
$22,669
13,188
kWh
|
$75 | ||
| TOTAL IMPLEMENTED | $295 | $250 |
$220
7,913
kWh
|
$75 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs