ITAC Assessment: AM0038
ITAC logo
ITAC Assessment: AM0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product CHEMICAL FORMULATIONS
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area
n/a
Annual Production 202,400
pieces
Production Hrs. Annual 2,777
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,961 412,954
kWh
Natural Gas $5,101 1,310
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,733 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,156

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,523 $2,737 $1,219
18,464
kWh
- $304
02 2.1233: Analyze flue gas for proper air/fuel ratio $372 $500 - $522
-
MMBtu
$(-150.0)
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $309 - $309
6,448
kWh
- -
04 2.2437: Recover waste heat from equipment $276 $250 - $276
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $54 $47 $54
879
kWh
- -
06 2.7261: Install timers and/or thermostats $123 $225 $61
1,172
kWh
$62
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $76 $200 $76
1,465
kWh
- -
TOTAL RECOMMENDED $2,733 $3,959 $1,719
28,428
kWh
$860
-
MMBtu
$154
TOTAL IMPLEMENTED $1,156 $1,175 $446
9,085
kWh
$860
-
MMBtu
$(-150.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs