ITAC Assessment: AM0036
ITAC logo
ITAC Assessment: AM0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product STEEL & ALUMINUM FASTENERS
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 26,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $482,750 11,427,022
kWh
Natural Gas $332,272 99,740
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,885 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $31,240 $127,710 - $31,240
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,300 - $2,300
81,184
kWh
-
03 2.4312: Improve lubrication practices $1,725 - $1,725
60,961
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $390 $235 $390
5,862
kWh
-
05 2.2511: Insulate bare equipment $230 $74 - $230
-
MMBtu
TOTAL RECOMMENDED $35,885 $128,019 $4,415
148,007
kWh
$31,470
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs