ITAC Assessment: AM0035
ITAC logo
ITAC Assessment: AM0035
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product AERIAL HYDRAULIC LIFTS
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area
n/a
Annual Production 1,820
pieces
Production Hrs. Annual 2,160
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,435 1,099,941
kWh
Natural Gas $8,618 1,920
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,578 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,355

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $4,912 - $4,912
181,125
kWh
-
02 2.7245: Use direct air supply to exhaust hoods $1,311 $6,200 - $1,311
-
MMBtu
03 2.2437: Recover waste heat from equipment $938 $550 - $938
-
MMBtu
04 2.6212: Turn off equipment during breaks, reduce operating time $696 $85 $296
10,844
kWh
$400
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $580 $300 $580
21,395
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $141 $128 $141
2,052
kWh
-
TOTAL RECOMMENDED $8,578 $7,263 $5,929
215,416
kWh
$2,649
-
MMBtu
TOTAL IMPLEMENTED $2,355 $1,063 $1,017
34,291
kWh
$1,338
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs