Assessment Year | 1988 |
---|---|
Principal Product | AIR CONDITIONING EQUIPMENT |
NAICS |
n/a
|
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 500,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $41,798 | 543,083 |
kWh
|
$0.077 |
Natural Gas | $9,606 | 1,655 |
MMBtu
|
$5.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,020 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,523 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $2,386 | $5,364 |
$2,386
-
kWh
|
- | - | |
02 | 2.7314: Reduce ventilation air | $1,535 | $427 |
$345
2,345
kWh
|
$1,190
-
MMBtu
|
- | |
03 | 2.2437: Recover waste heat from equipment | $1,322 | $1,100 | - |
$1,322
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,205 | $150 |
$1,205
33,705
kWh
|
- | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,091 | $2,400 | - |
$577
-
MMBtu
|
$514 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $330 | $131 |
$330
4,396
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $40 | $35 |
$40
586
kWh
|
- | - | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $111 | $100 |
$111
3,224
kWh
|
- | - | |
TOTAL RECOMMENDED | $8,020 | $9,707 |
$4,417
44,256
kWh
|
$3,089
-
MMBtu
|
$514 | ||
TOTAL IMPLEMENTED | $5,523 | $4,243 |
$1,920
41,032
kWh
|
$3,089
-
MMBtu
|
$514 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs