ITAC Assessment: AM0026
ITAC logo
ITAC Assessment: AM0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product AUTO AIR CONDITIONER COMPRESSORS
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area
n/a
Annual Production 236,000
pieces
Production Hrs. Annual 2,267
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,004 2,866,940
kWh
Natural Gas $23,424 6,653
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,407 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,771

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $867 $2,000 $867
29,308
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $8,053 $1,075 $1,923
65,064
kWh
$6,130
-
MMBtu
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,962 $10,000 $4,962
167,644
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $851 $300 $851
14,361
kWh
-
05 2.6218: Turn off equipment when not in use $492 $123 $218
6,448
kWh
$274
-
MMBtu
06 2.2511: Insulate bare equipment $182 $114 $182
6,155
kWh
-
TOTAL RECOMMENDED $15,407 $13,612 $9,003
288,980
kWh
$6,404
-
MMBtu
TOTAL IMPLEMENTED $9,771 $3,375 $3,641
108,733
kWh
$6,130
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs