ITAC Assessment: AM0025
ITAC logo
ITAC Assessment: AM0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BEEF PATTIES
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 89
Plant Area
n/a
Annual Production 12,000,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,177 1,674,678
kWh
Natural Gas $4,000 834
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,945 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,363

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3191: Use demand controller or load shedder $8,582 $15,000 $8,582
145,662
kWh
02 2.2511: Insulate bare equipment $913 $1,116 $913
35,170
kWh
03 2.6232: Install set-back timers $797 - $797
16,999
kWh
04 2.7492: Use proper thickness of insulation on building envelope $422 - $422
16,413
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $72 $72 $72
1,465
kWh
06 2.6232: Install set-back timers $159 - $159
3,517
kWh
TOTAL RECOMMENDED $10,945 $16,188 $10,945
219,226
kWh
TOTAL IMPLEMENTED $2,363 $1,188 $2,363
73,564
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs