ITAC Assessment: AM0024
ITAC logo
ITAC Assessment: AM0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product COPPER MANIFOLDS
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $1
M
to 5
M
# of Employees 42
Plant Area
n/a
Annual Production 775,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,852 189,625
kWh
Natural Gas $6,052 1,039
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,009 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings Administrative Changes Savings
01 2.1331: Burn a less expensive grade of fuel $1,734 - - $323
-
MMBtu
$(-425.0)
-
MMBtu
$1,836
02 2.8114: Change rate schedules or other changes in utility service $1,080 $3,440 $1,080
-
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $195 $792 $195
2,345
kWh
- - -
TOTAL RECOMMENDED $3,009 $4,232 $1,275
2,345
kWh
$323
-
MMBtu
$(-425.0)
-
MMBtu
$1,836
TOTAL IMPLEMENTED $1,929 $792 $195
2,345
kWh
$323
-
MMBtu
$(-425.0)
-
MMBtu
$1,836
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs