ITAC Assessment: AM0023
ITAC logo
ITAC Assessment: AM0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product VENEERED FRUIT
NAICS
n/a
SIC 2449: Wood Containers, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 2,304
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,059 162,075
kWh
Natural Gas $22,119 4,131
MMBtu
Wood $17,200 17,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,060 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,060

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings
01 2.4322: Use or replace with energy efficient substitutes $2,044 $1,000 - $2,044
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,902 $80 $2,099
43,376
kWh
- $(-197.0)
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $114 $80 $114
2,931
kWh
- -
TOTAL RECOMMENDED $4,060 $1,160 $2,213
46,307
kWh
$2,044
-
MMBtu
$(-197.0)
-
MMBtu
TOTAL IMPLEMENTED $4,060 $1,160 $2,213
46,307
kWh
$2,044
-
MMBtu
$(-197.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs