Assessment Year 1988
Principal Product PLASTIC CONTAINERS
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 13,000,000
lb
Production Hrs. Annual 8,472
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $528,507 9,645,076
kWh
Natural Gas $5,908 1,467
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,432 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,564

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2511: Insulate bare equipment $7,062 $5,600 $7,062
166,471
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,192 $7,675 $6,192
120,750
kWh
03 2.2511: Insulate bare equipment $2,294 $1,450 $2,294
53,927
kWh
04 2.5122: Replace high resistance ducts, pipes, and fittings $2,556 $300 $2,556
60,082
kWh
05 2.4312: Improve lubrication practices $1,619 - $1,619
38,101
kWh
06 2.7111: Reduce illumination to minimum necessary levels $652 $500 $652
10,844
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $57 $47 $57
879
kWh
TOTAL RECOMMENDED $20,432 $15,572 $20,432
451,054
kWh
TOTAL IMPLEMENTED $12,564 $7,850 $12,564
291,324
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs