Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product GALVANIZED FENCING
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area
n/a
Annual Production 9,900,000
lb
Production Hrs. Annual 3,734
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,201 312,427
kWh
Natural Gas $22,043 6,688
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,727

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $2,009 $3,919 - $2,009
-
MMBtu
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,198 $2,000 $1,198
15,533
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $939 $520 $939
12,309
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $360 - $360
4,689
kWh
-
05 2.4312: Improve lubrication practices $230 - $230
2,931
kWh
-
TOTAL RECOMMENDED $4,736 $6,439 $2,727
35,462
kWh
$2,009
-
MMBtu
TOTAL IMPLEMENTED $2,727 $2,520 $2,727
35,462
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs