ITAC Assessment: AM0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PEG BOARD PANELS
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 1,400,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,289 264,947
kWh
Natural Gas $41,154 7,746
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,187 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,920

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $3,753 $12,132 $(-1,615.0)
(-46,893)
kWh
$5,368
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,617 $520 $1,617
46,600
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $550 $700 $550
15,826
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $267 - $267
7,620
kWh
-
TOTAL RECOMMENDED $6,187 $13,352 $819
23,153
kWh
$5,368
-
MMBtu
TOTAL IMPLEMENTED $5,920 $13,352 $552
15,533
kWh
$5,368
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs