ITAC Assessment: AM0018
ITAC logo
ITAC Assessment: AM0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product EVAPORATORS & CONDENSERS
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area
n/a
Annual Production 150,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,539 351,114
kWh
Natural Gas $9,252 1,710
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,397 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,878

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,350 $1,000 $2,350
65,358
kWh
- -
02 2.2511: Insulate bare equipment $746 $77 - $746
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $210 - $210
5,862
kWh
- -
04 2.4312: Improve lubrication practices $156 $350 $156
4,396
kWh
- -
05 3.4156: Use flow control valves on equipment to optimize water use $773 $280 - - $773
06 3.4154: Eliminate leaks in water lines and valves $162 $70 - - $162
TOTAL RECOMMENDED $4,397 $1,777 $2,716
75,616
kWh
$746
-
MMBtu
$935
TOTAL IMPLEMENTED $2,878 $1,420 $2,716
75,616
kWh
- $162
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs