ITAC Assessment: AM0007
ITAC logo
ITAC Assessment: AM0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product NG LIQUIDS PROCES EQUIPMENT
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,420
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,029 2,157,093
kWh
Natural Gas $6,686 1,435
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,970

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3212: Optimize plant power factor $1,648 $5,000 $1,648
-
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $910 $520 $910
23,447
kWh
03 2.6212: Turn off equipment during breaks, reduce operating time $114 - $114
2,931
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,212 $3,205 $2,212
56,565
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,996 $2,146 $2,996
53,927
kWh
TOTAL RECOMMENDED $7,880 $10,871 $7,880
136,870
kWh
TOTAL IMPLEMENTED $6,970 $10,351 $6,970
113,423
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs